5.3.4.2. How Should Projects with Shorter Time Frames Be Treated?

Once the minimum project duration has been defined, it is also important to decide how to treat projects that have a shorter duration than the minimum required time frame. The options can be divided into two main approaches:

The choice of method for dealing with liability is linked with methods chosen for accounting for GHG benefits and when credits are given to projects (see Section 5.4).